Mobile
Log In Sign Up
Home > chinese-english > "scheme comparison" in English

English translation for "scheme comparison"

方案比选

Related Translations:
comparison of inferiority:  劣等比较
vast scheme:  庞大的计划
monitoring scheme:  监测布置
scheme drawing:  计划图
internal scheme:  内模式
scheming patrician:  诡计多端的贵族
geometric scheme:  几何图案
checklist scheme:  检验表法
qualified overseas scheme:  合资格海外计划
cargo consolidation scheme:  货物统筹计划
Example Sentences:
1.Coding schemes comparison
编码标准比较
2.Digital 21 : it infrastructure : infrastructure and standards : coding schemes comparison
数码:资讯科技基础建设:基础建设及标准:中文界面
3.Scheme comparison of the highway construction is an important content in the early stage of working
公路建设的方案比选是其前期工作中的一项很重要的内容。
4.Scheme comparison and safety assessment of earth and rockfill dams , tailing dams and soft foundation
从事土石(尾矿)坝、软土地基工程专业领域的设计方案技术论证、安全评价。
5.It is conducted a scheme comparison between prestressed concrete floor and plain concrete floor for an underground garage
摘要对地下车库预应力混凝土楼盖与普通混凝土楼盖的方案进行了比较。
6.The scheme comparison of railway location by interactive design ( scrlid ) dss is the main part of the railway survey and design decision support
交互式铁路线路方案比选决策支持系统( decisionsupportsystem ? dss )是铁路线路勘测设计计算机决策支持的主要部分。
7.Transmit / receive ( t / r ) modules is the base of the modern radar . the paper puts forth a design scheme according to the target including t / r switch , up conversion , power amplified , low noise receive and down conversion . the dimension is restricted to 106 89mm through scheme comparison and the existing experiment condition , the final products arrive at the target we expect with millimeter hybrid integrated circuit
收发t / r组件在当今雷达系统中占有举足轻重的地位,本文根据设计指标提出了毫米波前端的设计方案,系统功能上要求完成收发双工、上变频和功率放大、低噪声放大和下变频功能,外形尺寸为106 89mm ,通过综合方案比较,结合自身条件,选取了毫米波混合集成电路形式。
8.Zhao has taken the consultation work for designing of sri lanka superior court , nepal international conference mansion , algeria hotel , western building office of burkina faso , and gambian court , which includes scheme comparison and optimization , middle inspections , project completion acceptance and etc . , and all of these was well received by china ministry of foreign trade and economic cooperation as well as recipient country
1984年" 1992年曾为斯里兰卡高等法院、尼泊尔国际会议大厦、阿尔及利亚旅馆、布基纳法索西部办公楼、冈比亚法院等的设计做咨询工作,包括方案论证及优化、中间检查、工程竣工验收等,均受到外经贸部及受援国的好评。
9.The technical and economic evaluation of thin - type spunbond nonwoven project has mainly finished the following research work : ( 1 ) utilize the theory and method of < marketing > for market investigation , research and forecast , analyze the developing trend and market requirement of the nonwocen abroad and at home , conduct quantitative forecast for raw materials and product price , and explain that during the essential period when liaoyang petrochemical company regulates the structure of industries and product and remodels the main business items , selecting to build up the production device for thin - type spunbond nonwoven is suitable . ( 2 ) introduce techniques of different companies to form different schemes . after analyzing the features of various schemes in the thesis , through building up the target system of four levels and utilize technical comprehensive evaluating way to conduct technical evaluation of four schemes for the thin - type spunbond nonwoven project and get the prior sequence from schemes d , b , a to c . ( 3 ) different technical schemes have various cash circulation amounts , economic evaluation is first based on evaluating and confirming feasibility of each scheme by the single scheme finance , select and use the method of multiple schemes comparison selecting - inutual repelling type multiple schemes optimization , select introducing the scheme of d company technique as the optimum , then conduct undetermined analysis to further test and verify feasibility of schemes
阐明了辽化公司在调整产业结构和产品结构、重塑主营业务的关键时期选择建设8000吨年薄型纺粘非织造布生产装置是适宜的; ( 2 )引进不同公司的技术形成了不同的方案,论文在分析了各方案的特点后,通过建立四个层次的指标体系,运用技术综合评价的方法,对薄型纺粘非织造布项目的四个方案进行技术评价,确定了丁方案、乙方案、甲方案到丙方案的优先顺序; ( 3 )不同的技术方案有不同的现金流量,经济评价首先在单方案财务评价确认各方案可行的基础上,选用多方案比选? ?互斥型多方案选优的方法,选择引进丁公司技术的方案最优,而后,又进行了不确定性分析,进一步验证方案的可行性。
10.The main points of hlsip quality control includes : during the design stage , it is necessary to control the scheme comparison and optimum design , esp . the waterwork , electromechanical device and irrigation region planning , to improve the design quality and pay attention to control the long - term benefits of design results ; during construction period , the supervisor should help proprietor choose construction contractor , sign the construction contract , supervise the manufacture of equipment and strictly execute the quality control procedure to subject the construction to controlled mode ; in addition , the contractors must improve their quality self - control , maintain the notion " quality first " and insist the full process , multiway , and multi system control of construction quality
高扬程梯级提水灌溉工程质量控制的重点包括:设计阶段控制好方案对比、设计优化,特别是水工建筑、机电安装、灌区规划等多专业多目标的确定和协调,提高设计质量和深度,注重控制设计成果的长期效益;施工阶段协助业主选择好施工承包商,制定出严谨、完备的施工合同,搞好设备监造,严格执行质量控制程序,使工程施工时时处于受控状态;同时要提高承包商的质量自控能力,坚持施工质量的全过程、多方法、多体系控制。
Similar Words:
"schembra" English translation, "schembri" English translation, "scheme" English translation, "scheme against each other" English translation, "scheme arch" English translation, "scheme design" English translation, "scheme drawing" English translation, "scheme etc that is likely to collapse" English translation, "scheme for fame and seek for wealth" English translation, "scheme for irrigation and drainage" English translation